Negotiable
The date of payment from buyers deliver within days
Beijing
Long-term effective
2020-07-26 23:51
221
Company Profile
Yangzhou Jiying Sanitation Equipment Technology Co., LtdBy certification [File Integrity]
Contact:yzjiying(Mr.)
Email:
Telephone:
Phone:
Area:Beijing
Address:Beijing
Website:http://www.chinasnowremoval.com/ http://yzjiying.cnbianpin.com/
• Exceptional moldboard contour for effective snow removal at all plowing speeds. Heavy duty moldboard support structure permits snow clearing operations in the most severe conditions, including high snowfall accumulation roadways.
• Full moldboard safety trip mechanism upon encountering road obstructions, the complete moldboard extends forward through 2 trip arm assemblies
• Each trip arm utilizes a heavy duty compression spring, forcing the moldboard to return to its original plowing position after passing the road obstruction
• Moldboard "C" shaped design to reduce snow blow back during high speed operations.
Detailed Parameters:
Moldboard material:3.5mm steel
Cleaning path:2641mm/2896mm/3175mm
Overall length:3040mm/3352mm/3657mm
Overall height:1069mm
Weight:969kg/1002kg/1034kg
Available Options:
• Screw adjustable skid shoes.
• Screw adjustable mushroom shoes
• Carbide and rubber cutting edges
• End gates
• Rubber deflectors
http://www.chinasnowremoval.com/